Description:
title
Discuss, consider and/or take action to authorize the County Judge to sign modification three with Dekker/Perich/Sabatini, LLC.
body
Comment:
This modification will authorize DPS to move into Stage Two as outlined in the original agreement with DPS. This will change the compensation from a percentage based fee to a fixed fee. Fixed fee is $2,900,000.00 with $25,000 in reimbursable expenses as allowed by the original agreement.
Stage Two will include civil engineering, structural engineering, architectural design, landscaping design, interior design, lab design, mechanical, plumbing, and electrical engineering, technology and acoustical and vibration design.