Description:
title
Discuss, consider and/or take action to authorize the County Judge to sign Change Order #2 with Armstrong Mechanical, Inc. for the LCDC I.T. Room HVAC System Modification in the amount of $2,108.00.
body
Comment:
This CO for $2,108.00 is for removal and reinstallation of existing ductwork in the locker room area that was required to access the space for installation of structural supports for roof mounted condensing unit. These instructions were omitted on the plans to the contractor.